Marine Construction

Subsea piling, underwater cofferdams, and berth rehabilitation.

Subsea piling, underwater cofferdams, and berth rehabilitation.

HEAVY CIVIL Harbor Berths & Piers
PILING REPAIR Epoxy & Concrete Jackets
SCOUR CONTROL Articulated Riprap Placement
RADIUS St. Lawrence & Great Lakes
OPERATIONAL OVERVIEW & METHODOLOGY

Marine Civil Construction & Underwater Engineering

Dock hydro-demolition, sheet pile repair, cofferdam de-silting, and underwater concrete placement.

Marine infrastructure endures constant wave action, ice impact, corrosion, and biological fouling that degrade concrete and structural steel over time.

Chow Marine provides turnkey marine construction and rehabilitation services across harbor docks, navigational locks, bridge piers, and offshore intake structures. We combine heavy equipment rigging with commercial diving expertise.

Our capabilities include underwater hydro-demolition to remove deteriorated concrete, installation of composite pile jackets, sacrificial cathodic protection systems, and underwater tremie concrete pours using anti-washout admixtures.

We also operate high-volume submersible dredge pumps capable of evacuating silt, gravel, and organic debris from flooded cofferdams and intake sumps, establishing clean bedrock footings for structural foundations.

STANDARD OPERATING PROCEDURE (SOP) PROTOCOL // 4-PHASE RIGOR
01

Bathymetric & Structural Survey

Sonar depth profiling, visual diver structural mapping, and concrete core test review.

02

Cofferdam & Silt Excavation

Deployment of submersible agitation dredge pumps to clear accumulated sediment down to sound bedrock.

03

Hydro-Demolition & Rebar Prep

Selective water jet removal of compromised concrete and abrasive-free cleaning of structural reinforcement steel.

04

Formwork & Underwater Grouting

Erection of sealed fiberglass jacket forms and controlled injection of anti-washout structural marine grout.

ENGINEERING SPECIFICATIONS MATRIX CALIBRATED FIELD DATA
Concrete Repair Depth Subsea down to 30m
Grout Compressive Strength Up to 65 MPa Marine Grade
Silt Dredge Capacity Up to 250 m³/hr Slurry
Welding Certification CWB Certified Underwater Welder
Barge Support Self-Propelled Crane Barges
FIELD DEPLOYMENT CASE PROFILE VERIFIED HARBOR LOG

Commercial Bulk Pier Sheet Pile Wall Stabilization

CLIENT / SECTOR: Hamilton Port Authority Terminal Operator

Installation of 85 sacrificial zinc anode banks and encapsulation of 42 corroded steel H-piles using epoxy grout jackets.

OPERATIONAL OUTCOME: Extended pier service lifespan by an estimated 25 years with zero disruption to daily commercial ship berthing schedules.
TECHNICAL FAQ FREQUENT INQUIRIES
01

How does underwater concrete placement cure in cold marine water?

add

We utilize specialized non-shrink marine grouts and tremie concrete formulations with anti-washout cellulose polymers that cure reliably even in cold freshwater and seawater environments.

02

Can you work on retaining walls without halting surrounding dock traffic?

add

Yes. Our operations are staging-conscious and predominantly water-based using our support vessels and barges, leaving dock surfaces clear for shore crane and truck traffic.

03

Are your underwater welding procedures certified by the Canadian Welding Bureau (CWB)?

add

Yes. All Chow Marine underwater welders hold valid CWB underwater welding qualifications under CSA W48 / AWS D3.6 standards.

Marine Civil Construction & Underwater Engineering
CHOW MARINE INDUSTRIAL RIG HAMILTON HARBOR // 24/7 ACTIVE READINESS
MISSION COORDINATION & DISPATCH

Ready To Mobilize Crew & Tooling?

Connect directly with our Hamilton operations superintendent for emergency rapid mobilization, site evaluation, and firm engineering proposals.

COMPLIANCE & SAFETY ASSURANCE • SSPC-QP 1 / 2 Certified Surface Preparation • ISO 9001 / ISO 14001 Quality & Environmental Systems • Zero-Recordable Safety Target Policy