Chow Marine Logo
Home / SERVICES / Tunnel & Pipeline Inspections
43.2557° N, 79.8711° W // HAMILTON PORT DISPATCH
SERVICE CAPABILITY // CHOW MARINE

Tunnel & Pipeline Inspections

Long-range robotic crawler surveys of intake conduits and aqueducts.

Long-range robotic crawler surveys of intake conduits and aqueducts.

TETHER RANGE Up to 3,000m Single Run
SENSORS HD LiDAR, Sonar & Video
SEDIMENT MAPPING Volumetric Thickness Profile
TURNAROUND Comprehensive 3D GIS CAD
OPERATIONAL OVERVIEW & METHODOLOGY

Long-Range Tunnel & Subsea Pipeline Inspection

Multi-kilometer robotic pipeline mapping, acoustic LiDAR profiling, and internal video surveys.

Subsea pipelines, cooling water aqueducts, and municipal outfalls cannot be inspected by divers due to extreme distance, flow velocity, and access limitations.

Chow Marine utilizes specialized long-range crawler robots and swim-capable ROVs equipped with high-resolution rotational profiling sonars, high-definition laser measurement arrays, and multi-kilometer fiber optic tethers.

Our robotic platforms navigate flooded conduits up to 3,000 meters from a single access point, logging internal pipe ovality, crack propagation, joint displacement, sediment accumulation, and biological obstruction.

The collected telemetry is processed into detailed 3D CAD mesh models and geographic GIS layers, providing engineering clients with quantifiable data to prioritize capital rehabilitation projects.

STANDARD OPERATING PROCEDURE (SOP) PROTOCOL // 4-PHASE RIGOR
01

Hydraulic Flow & Ingress Audit

Acoustic Doppler velocity measurement, ingress point rigging, and safety tether winch placement.

02

Robotic Pipe Penetration

Long-distance tethered insertion with continuous gyroscopic heading and distance encoder logging.

03

Rotational Sonar & Laser Profiling

360-degree acoustic cross-sectional mapping to detect wall loss, debris mounds, and deformation.

04

Defect Analysis & 3D Deliverable

Compilation of defect severity index, digital video overlay, and GIS pipeline condition ledger.

ENGINEERING SPECIFICATIONS MATRIX CALIBRATED FIELD DATA
Single-Entry Reach Up to 3,000 meters (10,000 ft)
Diameter Range 0.6m to 8.0m Conduits
Sonar Resolution Millimeter-Accurate Acoustic Profiling
Laser Profiling Full 3D Internal Surface Point-Cloud
Flow Capability Operates in Active Flow up to 1.5 m/s
FIELD DEPLOYMENT CASE PROFILE VERIFIED HARBOR LOG

2.2 km Submerged Industrial Cooling Aqueduct Survey

CLIENT / SECTOR: Great Lakes Petrochemical Refining Complex

Inspection of 2,200 meters of 2.1-meter diameter steel cooling water line running beneath an active shipping canal.

OPERATIONAL OUTCOME: Identified an unrecorded 45-meter section of heavy sediment buildup and four corroded sleeve joints, enabling targeted mobile vacuum recovery that restored cooling water capacity by 22%.
TECHNICAL FAQ FREQUENT INQUIRIES
01

Can your pipeline robots operate while water is still flowing through the pipe?

add

Yes. Our specialized flow-tolerant crawlers have heavy ballast and tractor treads that grip pipe inverts in flows up to 1.5 m/s, or we can deploy neutrally buoyant drogue-assisted inspection vehicles that travel with the water flow.

02

What is the minimum and maximum pipe diameter you can inspect?

add

We operate micro-crawlers for pipelines as small as 600mm (24 inches) and heavy ROVs for tunnels exceeding 8 meters in diameter.

03

What data format do you deliver to engineering clients?

add

We supply georeferenced GIS data layers, AutoCAD/Civil 3D point clouds, cross-sectional ovality graphs, and interactive 4K video player files indexed to pipeline stationing coordinates.

Long-Range Tunnel & Subsea Pipeline Inspection
CHOW MARINE INDUSTRIAL RIG HAMILTON HARBOR // 24/7 ACTIVE READINESS
MISSION COORDINATION & DISPATCH

Ready To Mobilize Crew & Tooling?

Connect directly with our Hamilton operations superintendent for emergency rapid mobilization, site evaluation, and firm engineering proposals.

COMPLIANCE & SAFETY ASSURANCE • SSPC-QP 1 / 2 Certified Surface Preparation • ISO 9001 / ISO 14001 Quality & Environmental Systems • Zero-Recordable Safety Target Policy