Chow Marine Logo
Home / SERVICES / Tunneling & Pipeline Support
43.2557° N, 79.8711° W // HAMILTON PORT DISPATCH
SERVICE CAPABILITY // CHOW MARINE

Tunneling & Pipeline Support

Hyperbaric interventions, intake pipe descaling, and conduit inspection.

Hyperbaric interventions, intake pipe descaling, and conduit inspection.

TUNNEL DIAMETER 1.2m to 6.0m+ Systems
HYPERBARIC TBM Cutterhead Intervention
PIPELINE RUNS Multi-Kilometer Penetration
GAS PURGING Atmospheric Scrubber Teams
OPERATIONAL OVERVIEW & METHODOLOGY

Tunneling & Underground Infrastructure Marine Support

TBM cutterhead interventions, hyperbaric locks, intake pipeline de-silting, and aqueduct cleaning.

Large-diameter tunneling projects beneath waterways face extreme hydrostatic pressures, soil instability, and compressed-air intervention requirements.

Chow Marine provides specialized marine and hyperbaric engineering support for Tunnel Boring Machine (TBM) operations, submerged pipeline construction, and deep municipal aqueducts.

Our teams specialize in compressed-air cutterhead interventions, supplying certified hyperbaric decompression chambers, qualified medical chamber operators, and saturation divers to change TBM cutter discs under pressures exceeding 5 bar.

We also execute long-distance tunnel de-silting and inspection operations using high-thrust crawler jetters and vacuum extraction lines extending hundreds of meters underground.

STANDARD OPERATING PROCEDURE (SOP) PROTOCOL // 4-PHASE RIGOR
01

Hyperbaric Medical Protocol

Establishment of hyperbaric treatment facilities, compressed-air decompression tables, and physician watch.

02

Cutterhead Air Lock Ingress

Controlled compression of hyperbaric technicians into pressurized cutterhead chamber under bentonite slurry.

03

Disc Cutter Replacement

Torquing and replacing worn carbide roller discs, hydro-cleaning cutterhead spray nozzles, and inspecting structural wear.

04

Controlled Decompression

Staged oxygen decompression in accordance with CSA Z275.1 standards and post-intervention medical clearance.

ENGINEERING SPECIFICATIONS MATRIX CALIBRATED FIELD DATA
Intervention Pressure Up to 6.5 Bar Compressed Air
Chamber Systems Multi-Place Twin-Lock Hyperbaric Units
Medical Oversight Certified Diving Medical Officers on Call
Breathing Gases Medical Air / Nitrox / Trimix
Tunnel Jetting Reach Up to 1,000m Internal Line
FIELD DEPLOYMENT CASE PROFILE VERIFIED HARBOR LOG

Hyperbaric Cutterhead Interventions on Sub-Aqueous Transit Tunnel

CLIENT / SECTOR: International Joint Venture Tunneling Contractor

Management of 28 consecutive pressurized cutterhead interventions at 4.2 bar pressure to replace 64 worn cutting discs beneath an active shipping canal.

OPERATIONAL OUTCOME: Zero decompression sickness incidents, 100% cutterhead availability, and seamless project delivery 3 weeks ahead of contract schedule.
TECHNICAL FAQ FREQUENT INQUIRIES
01

What is a hyperbaric cutterhead intervention?

add

When a tunnel boring machine digs beneath a body of water or through water-bearing soil, the front excavation chamber must be pressurized with compressed air or bentonite slurry to keep water from rushing in. Technicians enter through air locks under high pressure to inspect and replace worn cutter tools.

02

What safety standards govern your hyperbaric tunneling work?

add

We comply with CSA Standard Z275.1 (Hyperbaric Operations), OSHA 29 CFR 1926 Subpart S, and the International Tunneling Association (ITA) guidelines for compressed air work.

03

Do you provide on-site decompression chambers?

add

Yes. We supply transportable, containerized multi-place hyperbaric treatment chambers complete with medical locks, primary and secondary air supplies, fire suppression, and environmental scrubbers.

Tunneling & Underground Infrastructure Marine Support
CHOW MARINE INDUSTRIAL RIG HAMILTON HARBOR // 24/7 ACTIVE READINESS
MISSION COORDINATION & DISPATCH

Ready To Mobilize Crew & Tooling?

Connect directly with our Hamilton operations superintendent for emergency rapid mobilization, site evaluation, and firm engineering proposals.

COMPLIANCE & SAFETY ASSURANCE • SSPC-QP 1 / 2 Certified Surface Preparation • ISO 9001 / ISO 14001 Quality & Environmental Systems • Zero-Recordable Safety Target Policy